100_3648 The start...September 2005. Rear wall of the existing garage was removed and the new foundatins were dug. 100_3647 100_3645 100_3644 100_3643 100_3642 100_4387 November 2005. Foundations in, blocks and floor down. 100_4386 100_4533 January 2006. Pier cast, 2ft in the ground and 2ft above. 14 inches square. 100_4532 100_4531 100_4530 100_4777 April 2006. Main observatory foundations in. 100_4778 100_4779 First wall up 100_4780 100_4781 100_4782 Blocks and floor layed 100_4783 100_4784 100_4785 100_4786 100_4787 100_4788 100_4789 100_4790 100_4797 May 2006. Floor down. 100_4798 100_4799 100_4800 100_4801 100_4882 May 2006. Wall done.